I was in charge of the project at the beginning, but I did things less aggressive than he did, which might delay the project. He took it over with his way, but led to a completed disaster on costumer's site. That wasn't just bad mouth, I totally disagreed what he did. But I followed his instructions since he took it over for he was the boss.
回複:did you bad mouth the project all the time? If so, leave now
所有跟帖:
•
關鍵在於你領了多長時間他又領了多少時間,最後失敗是你執行的失敗還是他決策大方向的失敗。
-g18-
♀
(0 bytes)
()
02/19/2014 postreply
18:44:17
•
回複:關鍵在於你領了多長時間他又領了多少時間,最後失敗是你執行的失敗還是他決策大方向的失敗。
-大不了_沒什麽-
♂
(106 bytes)
()
02/21/2014 postreply
13:15:27