know a lot about the product at the first place? Who is the product owner? do they have product requirements? The QA should start with the product requirements document first.If they are doing the blackbox testing, what do they even care about the backend design?
How did the QA even sign off the production release if they don'
所有跟帖:
• 是這樣:我這project 其實是把以前一個ACCESS寫的project -expectingMM- ♀ (436 bytes) () 12/07/2012 postreply 14:15:40
• 哈哈哈,就把你那個outdated document 扔給他看去。 -Eveline- ♀ (151 bytes) () 12/07/2012 postreply 14:21:33
• 再給你說說他怎麽當的manager吧. -expectingMM- ♀ (412 bytes) () 12/07/2012 postreply 14:35:43
• 真夠受的。他的頭是誰?他的頭水平怎麽樣? -Eveline- ♀ (185 bytes) () 12/07/2012 postreply 14:46:54
• 他的頭就是我們的CEO呀. 我們公司還不到40人. -expectingMM- ♀ (0 bytes) () 12/07/2012 postreply 14:54:04
• 難怪他去CEO那裏告狀 -Eveline- ♀ (158 bytes) () 12/07/2012 postreply 15:08:19