borisg

最後登錄:2025-03-26 17:02:53

頭像照片
borisg的個人信息
性別:
筆名: borisg
個人描述:
 
發送悄悄話 給我留言
borisg的個人簡介
borisg的朋友圈
-幸福的花花世界-
幸福的花花世界
 
 
borisg的最新博客
 
borisg的最新博客評論
 
borisg的群組
borisg的留言薄 (最近5條留言)
-Aurora2015- 留言於:2025-03-09 15:02:50
Aurora2015
在網上認識你很高興,謝謝你的支持和鼓勵,請多指教。
-ssmzxy- 留言於:2024-09-16 11:37:25
ssmzxy
Dear XX: These exterior pictures give a lot of information. To make it clear, I will be using firefighter language, A side = street side, B side = left (clockwise from A), C=back of house, D = right side of A. A side appears to suggest that there is no significant damage to the ridge beam. What you can see is sagging on both sides of the chimney rather symmetrically. Look at the distances between rows of shingles near the ridge in the photo. B side images indicates that the up left part of the house was not built quite square, as judged from the unequal lengths of siding pieces between the left corner and window. I do not think the B side wall is distorted. C side garage roof sinks a couple of inches over the rear entrance, and you can see that the back window of garage is distorted. On the other hand, the roof edge of the second floor remains straight. D side the shed was heavily damaged, that might have reduced the force on the house from the tree. This is probably not salvageable . General impression: The house has been ignored for too long (much longer than the allerged 3 years since the condemnation). Remember none of our houses were as bad or even close. I would say this has not been taken care of for at least 15 years except for the front side. The required repair/restoration work for the exterior probably cost more than the structure fix due to the fallen tree. Estimate of work: 1. repair the garage roof frame. I would put a 2000 for everything 2 days. 2. replace roof of house and garage. Material: about 15 square of shingles, probable 15 sheets of OSB for the shade side. Material cost: 2000 for shingles and tar papers, OSB 300, incidentals 200, total material cost 2500, labor hours 10 days including removal of old shingles and water damaged OSB. 3. windows: about 18 windows, material cost 3600+ 400 incidentals, total 4000. labor hours 6 days. 4. wooden trims, gutters, estimated 150 linear feet, material cost 1500. labor hour 5 days. 5. Exterior cleaning and painting 2 coats: Material 300, labor 6 days. 6. Ground cleaning, shed dismantling. Material cost: 100, labor 3 days. 7. cleaning: dumpster rental 600. 3 days. Total: 11000. Add a safety margin, make it 12000. Total labor: 32 days. Say if you hire some expensive handyman to do this for 500 a day (you probably can get a lot cheaper), this would be 28k.
-滿懷希望z- 留言於:2023-12-15 15:53:19
滿懷希望z
不常來文學城,但偶爾也有精美的收獲,十分高興在文學城欣賞了你的多篇文章。企盼多多交流。我的微信號:Zhangcindy328 歡迎來家做客。
-紅鉛筆- 留言於:2023-04-26 13:15:50
紅鉛筆
Hi Borisg, 一直很喜歡讀你的帖。 請教個問題:17歲的孩子想做EMT volunteer, 怎樣才能拿到volunteer certificate。 查了一下, 要18歲才能上課。你是行家,有啥建議? 謝謝
-遇見就好- 留言於:2022-09-29 15:00:41
遇見就好
Hi borisg, do you live in the Bay Area?
點擊查看更多...
給 borisg 留言
注意: 請不要在留言中留下不友好信息或者類似侮辱性的言辭。
本留言簿隻允許文學城注冊筆名留言,遊客不可以留言。 如果您還沒有注冊, 請點擊這裏注冊文學城筆名