回複:how much it will cost to change 1/2 bath to full bath?

來源: borisg 2012-06-27 17:50:05 [] [博客] [舊帖] [給我悄悄話] 本文已被閱讀: 次 (453 bytes)

1.knock down shower, drywall, open access to drainage. 100-150

2.material: tub 100, shower head set 100, surround 100, plumbing supplies 100, floor 50. Total 450. If you need more drainage, add 50. May need paint the whole room afterwards.

Installation labor: 300.

Debris removal and cleaning: 50.

Now if someone tells you that you can go cheaper, you probably can do, but the quality of work is probably not good.

所有跟帖: 

1/2 bath usually does not have shower -beachlver- 給 beachlver 發送悄悄話 (68 bytes) () 06/27/2012 postreply 20:05:33

請您先登陸,再發跟帖!

發現Adblock插件

如要繼續瀏覽
請支持本站 請務必在本站關閉/移除任何Adblock

關閉Adblock後 請點擊

請參考如何關閉Adblock/Adblock plus

安裝Adblock plus用戶請點擊瀏覽器圖標
選擇“Disable on www.wenxuecity.com”

安裝Adblock用戶請點擊圖標
選擇“don't run on pages on this domain”