發展商成本:

1) Purchase of land;

2) Architect design fee;

3) Structural design fee;

4) Construction cost (including demolition, materials, construction (site engineers, skilled works and unskilled labors), landscaping, M&E (mechanical & Electrical), etc.

5) Other miscellaneous fees (legal fees, adminstration expenses, publicity, etc)

 

大概比例:

總投資費用(按花花新聞消息)= 約850元/每尺

1)土地:按花花新聞土地投標消息是 = 約430元/每尺 = 50% (占了一半)

4)constructoin cost,按老鍾BCA的數據是 = 約200/每尺 = 25%

其他三項 (2)+ (3) +(5) = 900 - 430 - 200 = 270元/每尺 = 25%

 

Site manpower 工地人工費用(包括site engineers,skilled works and unskilled labors)在第四項 construction cost 可能約占30% ,占總投資費用約7~8%。

 