Nuclear reactors under construction and planned
Plant | Province | MWe gross | Reactor model | Project control | Construction start | Operation |
Ling Ao Phase II unit 2 |
Guangdong | 1080 | CPR-1000 | CGNPC | 5/06 | 8/11 |
---|---|---|---|---|---|---|
Qinshan Phase II unit 4 |
Zhejiang | 650 | CNP-600 | CNNC | 1/07 | 2012 |
Hongyanhe units 1-4 |
Liaoning | 4x1080 | CPR-1000 | CGNPC | 8/07, 4/08, 3/09, 8/09 | 10/12, 2013, 2014 |
Ningde units 1-4 |
Fujian | 4x1080 | CPR-1000 | CGNPC, with Datang | 2/08, 11/08, 1/10, 9/10 | 12/12, 2013, 2014, 2015 |
Fuqing units 1&2 |
Fujian | 2x1080 | CPR-1000 | CNNC | 11/08, 6/09 | 10/13, 8/14 |
Yangjiang units 1-4 |
Guangdong | 4x1080 | CPR-1000 | CGNPC | 12/08, 8/09, 11/10, 15/3/11 | 8/13, 2014, 2015, 2016 |
Fangjiashan units 1&2 |
Zhejiang | 2x1080 | CPR-1000 | CNNC | 12/08, 7/09 | 12/13, 10/14 |
Sanmen units 1&2 |
Zhejiang | 2x1250 | AP1000 | CNNC | 3/09, 12/09 | 11/13, 9/14 |
Haiyang units 1&2 |
Shandong | 2x1250 | AP1000 | CPI | 9/09, 6/10 | 5/14, 3/15 |
Taishan units 1&2 |
Guangdong | 2x1770 | EPR | CGNPC | 10/09, 4/10 | 12/13, 11/14 |
Hongyanhe units 5&6 |
Liaoning | 2x1080 | CPR-1000 | CGNPC | 2011, 2011 | 2015 |
Shandong Shidaowan | Shandong | 210 | HTR-PM | Huaneng | 3/11 | 2015 |
Fangchenggang units 1&2 |
Guangxi | 2x1080 | CPR-1000 | CGNPC | 7/10, 2011 | 2015, 2016 |
Fuqing units 3&4 |
Fujian | 4x1080 | CPR-1000 | CNNC | 7/10, 2011 | 7/15, 5/16 |
Fuqing units 5&6 |
Fujian | 2x1080 | CPR-1000 or CNP1000 |
CNNC | ?, ? | - |
Changjiang units 1&2 |
Hainan | 2x650 | CNP-600 | CNNC & Huaneng | 4/10, 11/10 | 2014, 2015 |
Hongshiding (Rushan) units 1&2 |
Shandong | 2x1080 | CPR-1000 | CNEC/CNNC | Deferred from 2009? | 2015 |
Ningde units 5&6 |
Fujian | 2x1080 | CPR-1000 | CGNPC | ||
Xianning (Dafan) units 1&2 |
Hubei | 2x1250 | AP1000 | CGNPC | 2011 or 2015 | 2015? |
Taohuajiang units 1-4 |
Hunan | 4x1250 | AP1000 | CNNC | 2011 or 2015 | 4/2015-2018? |
Pengze units 1&2 |
Jiangxi | 2x1250 | AP1000 | CPI | 2011 or 2015 | 2015? |
Xudabao / Xudapu units 1&2 |
Liaoning | 2x1250 | AP1000 | CNNC with Datang | 9/11, ? | |
Sanmen units 3&4 |
Zhejiang | 2x1250 | AP1000 | CNNC | ||
Haiyang units 3&4 |
Shandong | 2x1250 | AP1000 | CPI | 2010? | |
Xiaomoshan units 1&2 |
Hunan | 2x1250 | AP1000 | CPI | 2011? | |
Longyou (Zhexi) units 1&2 |
Zhejiang | 2x1250 | AP1000 | CNNC | 2011? | |
Sanming units 1&2 |
Fujian | 2x880 | BN-800 | CNNC | 8/2011 | 2018, 19 |
Zhangzhou units 1&2 |
Fujian | 2x1250 | AP1000 | CNNC & Guodian | 2011 | |
Yanjiashan/Wanan/Ji'an | Jiangxi | 2x1250 | AP1000 | CNNC | 2011? | |
Shaoguan units 1-4 |
Guangdong (inland) | 4x1250 | AP1000 | CGNPC | 2013 | |
Tianwan units 3&4 |
Jiangsu | 2x1060 | VVER-1000 (AES-91) |
CNNC | 12/12, 8/13 | |
Tianwan units 5&6 |
Jiangsu | 2x1200 | VVER-1200 or CPR-1000 | CNNC | ?, ? | |
Wuhu units 1&2 |
Anhui | 2x1250 | AP1000 | CGNPC | 12/2011 | 8/2016 |
Lianyungang units 1&2 |
Jiangsu | 2x1080 | CPR-1000 | CGNPC | ||
Shanwei (Lufeng) units 1&2 |
Guangdong | 2x1080 | CPR-1000 | CGNPC | by 2015? | |
33x1080 32x1250 2x1060 2x1200 2x1770 2x880 3x650 1x210 |
||||||
Total: 77 | 87,620 MWe |
Where construction has started, the dates are marked in bold. Those here not under construction are marked as 'planned' in the WNA reactor table. At 31 December 2010, 27 under construction: 29,790 MWe; 50 planned: 57,830 MWe (gross).
Fangjiashan is sometimes shown as a development of Qinshan Phase I.
Further nuclear power units proposed
Plant | Province | MWe gross | Expected model | Project control | Construction | Start up |
Lianyungang units 3&4 |
Jiangsu | 2x1080 | CPR-1000 | CGNPC | ||
---|---|---|---|---|---|---|
Taishan units 3&4 |
Guangdong | 2x1770 | EPR | CGNPC | by 2015 | |
Nanchong (Nanchun, Sanba) | Sichuan | 4x1080 | CPR-1000? | CGNPC | ||
Tianwan units 7&8 |
Jiangsu | 2x1200 | VVER-1200 (AES-2006) |
CNNC | ||
Yangjiang units 5&6 |
Guangdong | 2x1080 | CPR-1000 | CGNPC | 2017 | |
Xianning (Dafan) units 3&4 |
Hubei | 2x1250 | AP1000 | CGNPC | ||
Shidaowan units 1-4 |
Shandong | 4x1250 | AP1000 | Huaneng | 2013? | |
Shidaowan units 5&6 |
Shandong | 2x1400 | CAP1400 | Huaneng | 2013? | |
Shandong Shidaowan | Shandong | 18x210 | HTR-PM | Huaneng | ||
Changjiang units 3 & 4 |
Hainan | 2x650 | CNP-600 or ACP-600 |
CNNC & Huaneng | ||
Haiyang units 5&6 |
Shandong | 2x1250 | AP1000 | CPI | ||
Xiaomoshan units 3-6 |
Hunan | 4x1250 | AP1000 | CPI | ||
Xudabao / Xudapu units 3-6 |
Liaoning | 4x1250 | AP1000 | CNNC with Datang | ||
Shanwei (Lufeng) units 3-6 |
Guangdong | 4x1080 | CPR-1000 | CGNPC | ||
Fangchenggang units 3-6 |
Guangxi | 4x1080 | CPR-1000 | CGNPC | ||
Yingtan | Jiangxi | 2? | Huaneng | |||
Nanyang units 1-6 |
Henan | 6x1250? | AP1000 (if CPI) | CNNC or CPI | ||
Xinyang units 1-4 |
Henan | 4x1080 | CPR-1000? | CGNPC? | ||
Changde (Chenzhou, Hengyang) | Hunan | 4x1000? | CNNC & Guodian?, CGNPC | |||
Subtotal: 74 units | 68,000+ MWe | |||||
Jiyang | Anhui | 4x? | CNNC | |||
Sanmen units 5&6 |
Zhejiang | 2x1250 | AP1000 | CNNC | ||
Cangnan | Zheijiang | 6x1000 | CGNPC/Huaneng | |||
Zhexi /Longyou units 3&4 |
Zhejiang | 2x1250 | AP1000 | CNNC | ||
Haijia /Haifeng units 1&2 |
Guangdong | 2x1000? | CGNPC | |||
Jinzhouwan units 1&2 |
Liaoning | 2x1000 | ||||
Fuling units 1-4 |
Chongqing | 4x1250 | AP1000 | CPI | ||
Jingyu units 1-4 |
Jilin | 4x1250 | AP1000 | CPI & Guodian | 2013? | |
Wuhu units 3-4 |
Anhui | 2x1250 | AP1000 | CGNPC | ||
Pengze units 3&4 |
Jiangxi | 2x1100 | AP1000 | CPI | ||
Heyuan /Jieyang units 1-4 |
Guangdong | 4x1000 | CNNC? | |||
Haiyang units 7&8 |
Shandong | 2x1250 | AP1000 | CPI | ||
Pingnan/Baisha units 1-4 |
Guangxi | 4x1250 | AP1000 | CPI | ||
Hengren units 1-4 |
Liaoning | 4x1250 | AP1000 | CPI | ||
Lanzhou | Gansu | 2? | CNNC | |||
Xiangtan | Hunan | 4x1250 | AP1000 | Huadian | ||
Donggang | Liaoning | 4x1000 | Huadian | |||
Shizu | Chongqing | CNNC | ||||
Qiaofushan | Hebai | CNNC | ||||
Songzi/Xianning 5&6 | Hubei | AP1000 | CGNPC | |||
Guangshui | Hubei | 4x1250 | AP1000 | CGNPC | ||
Hebaodao | Guangdong | CNNC | ||||
Yibin | Sichuan | CNNC | ||||
Sanming 3&4 | Fujian | 2x880? | BN-800? | CNNC | 2015 | |
Site to be decided | Heilongjiang | 4x1000 | Huaneng | |||
Subtotal: about 72 units | 32x1250 20x1000 2x880 c.18x210 Approx. 80,000 MWe |
|||||
Total: about 140 | 138,000+ MWe |
All PWR except Shidaowan HTR-PM and Sanming BN-800. Some of these entries are based on sketchy information. For WNA reactor table, 80% of numbers and capacity from this table are listed as 'Proposed'