是不是真的,看看這裏。

來源: 吃糖? 2011-04-01 16:11:21 [] [舊帖] [給我悄悄話] 本文已被閱讀: 次 (4859 bytes)

百度wiki裏說:“為消除各方顧慮,電站引進了法國核島技術裝備和英國的常規島技術裝備進行建造和管理,並由一家美國公司提供質量保證。1987年開工,使用壓水型反應堆技術,安裝兩台90萬千瓦發電機組,於1994年全部並網。”

你可能不信百度的,再看看這個。

http://www.eia.doe.gov/cneaf/nuclear/page/nuc_reactors/china/reactors.html

這網站說:

Daya Bay 1 is located near Shenzhen in Guangdong province. Daya Bay 1 is operated by the Guangdong Nuclear Power Joint Venture Company, Ltd. The reactor was designed and built (with Chinese participation) by the French National Company, Framatome.

Daya Bay 2 is the twin of Daya Bay 1, and the details that follow are identical. Unit 2 is located near Shenzhen in Guangdong province. Daya Bay 2 is operated by the Guangdong Nuclear Power Joint Venture Company, Ltd. The reactor was designed and built (with Chinese participation) by the French National Company, Framatome.

再看看這兒(http://www1.american.edu/TED/dayabay.htm)

Daya Bay Nuclear Power Plant Project: When the Daya Bay nuclear power plant project was negotiated, it was China's largest foreign joint venture (JV). The agreement brought together the Guangdong Nuclear Power Investment Company and the Hong Kong Nuclear Investment Company (owned by Hong Kong's China Light and Power) under the establishment of the Guangdong Nuclear Power Joint Venture Company.

1. Financing: Total plant construction costs for the Daya Bay project were estimated at $4 billion.(22) Ten percent of the $4 billion was to be financed through equity; the other 90% would be financed with debt. The Hong Kong Nuclear Investment Company pledged 25% of the equity (equivalent to $100 million). The remaining $300 million in equity was to be put up by the Guangdong Nuclear power Investment Company. With respect to the debt financing component, the Bank of China would float international loans to be financed across the first 20 years of Daya Bay's operations. Export credit loans comprised 2/3 of the debt, while commercial loans accounted for the remaining 1/3. Loan repayment would stem from Daya Bay's electricity receipts.

Although the Guangdong Nuclear Power Investment Company possesses the larger equity share of the JV (75%), it uses only 30% of the total output and sells the other 45% to the Hong Kong Nuclear Investment Company. The power output retained by Guangdong will be channeled into the province's electrical grid to alleviate present energy shortages.(23)

2. Construction and Equipment Provisions: France's Electricite de France was slated for control over designing, building, and commissioning the nuclear power plant. Framatome of France was awarded the contract for supplying Daya Bay's two nuclear reactors and Great Britain's General Electric Corporation received the bid to supply the turbine generators required for the project.

During the Reagan Administration a U.S.-PRC nuclear cooperation agreement was drafted. Concern over China's nuclear trade with Islamabad, however, resulted in the agreement becoming a hostage of Congress for over a year. When a joint resolution finally passed, U.S. cooperation with China was conditioned by China's compliance with the Atomic Energy Act and other U.S. non-proliferation laws. A presidential certification of compliance must therefore be issued prior to the granting of export licenses to U.S. exporters. In effect, these controls severely inhibited full participation of U.S. companies in China's nuclear energy market.(24)

Beginning in 1994, however, some of the controls were relaxed. U.S. companies were permitted to export plant equipment, including steam turbines, boilers and generators. The policy change facilitated Westinghouse's ability to establish a JV in China, in 1995, for the manufacturing of nuclear power plant inspection equipment. Future Nuclear Power Projects Involving Foreign Participation: Under the ninth, five-year plan, Guangdong province will erect a second nuclear power plant in Lingao (1 km east of the Daya Bay plant). The French company, Framatome will supply the two, 985 megawatt reactors; turbines will be supplied by GEC-Alstrhom.(25) The Lingao plant will require US$4.1 billion in foreign financing for construction.

 

幹日本什麽事兒,沒看出來啊。怎麽回事?你同學他哥也是騙子?是不是日本為大亞灣設計日式浴室啊?

所有跟帖: 

不太懂,不過好像不矛盾呀,一個是設計,一個是設備提供 -zhongguorenatjapan- 給 zhongguorenatjapan 發送悄悄話 (0 bytes) () 04/01/2011 postreply 17:45:31

唉,至少你要看清楚才反對,我本來加粗的,現在放大一點給你看。 -吃糖?- 給 吃糖? 發送悄悄話 (581 bytes) () 04/01/2011 postreply 18:11:24

請您先登陸,再發跟帖!

發現Adblock插件

如要繼續瀏覽
請支持本站 請務必在本站關閉/移除任何Adblock

關閉Adblock後 請點擊

請參考如何關閉Adblock/Adblock plus

安裝Adblock plus用戶請點擊瀏覽器圖標
選擇“Disable on www.wenxuecity.com”

安裝Adblock用戶請點擊圖標
選擇“don't run on pages on this domain”