NSC seems very slow and tough.
My case: I-140 and I-485: 4-28-2005.
after POJ in June, told that it is under NC. I called POJ today, was told that the cse is closed, what does that mean?
My case: I-140 and I-485: 4-28-2005.
after POJ in June, told that it is under NC. I called POJ today, was told that the cse is closed, what does that mean?