The Ford class was conceived to address evolving threats and provide a high-end warfighting platform.
-
Northrop Grumman received a contract for the detail design and construction of the carrier, marking the completion of the initial design phase.
-
Additional contracts were awarded to Northrop Grumman to continue the engineering and design work for the USS Gerald R. Ford.
-
Major design changes were required to fix issues with the ship's main turbine generators, and these modifications were completed and verified by May 2017.
-
The USS Gerald R. Ford was formally delivered to the Navy and commissioned, a process that required installing the new components and resolving issues found during the initial design and construction phase
有關福特號為什麽不能彈射F35C,大家不用再爭論了。看看時間線。
所有跟帖:
•
福特已經服役八年了
-Bob007-
♂
(0 bytes)
()
09/28/2025 postreply
08:48:37
•
當初設計時F35還沒定型
-Uusequery-
♀
(0 bytes)
()
09/28/2025 postreply
08:50:47
•
2001年F-35就已經拿到了合同,2006首飛
-cn_abcd-
♂
(0 bytes)
()
09/28/2025 postreply
08:52:43
•
福特號2005年開始建造
-Bob007-
♂
(0 bytes)
()
09/28/2025 postreply
08:57:23
•
這是F35C研發,裝備時間線。。。
-Uusequery-
♀
(20088 bytes)
()
09/28/2025 postreply
09:01:39