多謝各位。 剛剛上網察看, 原來要自己去申請。 請問申請的過程麻煩嗎?
Conditions of Installation
1. Customers are required to obtain all relevant approvals, consents, and permits prior to installation –
please ensure that you check with your local council/planning authority and body corporate. Consent
and permit requirements do vary between states. For customers who do not own the property, you
must also ensure that you get written permission from the owner of the property and provide this to
Origin at the time of sale.
It is the customer’s responsibility to ensure the customer’s premises complies with relevant electricity
standards prior to solar installation. In the event the premise does not comply, customers will be
required to ensure all relevant works are completed by a qualified electrician. Works may include (but
not limited to) the following:
•
Rectifying an inadequate existing electrical supply.
•
Installation of a safety switch.
•
Upgrading of a switchboard.
•
Upgrading of meter panel board
•
Additional works where there is insufficient room in the meter box (for a Gross meter) for the
measuring of exported electricity or;
•
Where a meter box is non-compliant.