應該可以,具體要看city design codes.

來源: 2012-06-20 16:12:36 [舊帖] [給我悄悄話] 本文已被閱讀:

能接public water就接。will need approval to run service line through neighboring lot. Not much room needed to install a 1" service line but many cities have minimum utility easement width requirement of 5'.