I485 processing time (TSC): 9/1/2008 is changed to 8/23/2007
I checked I485 processing time at TSC. It was 9/1/2008 on 7/15/2009 and 7/16/2009. But today (7/17/2009) it is changed to 8/23/2007. Anybody can explain this?
I checked I485 processing time at TSC. It was 9/1/2008 on 7/15/2009 and 7/16/2009. But today (7/17/2009) it is changed to 8/23/2007. Anybody can explain this?