![](//blog.wenxuecity.com/images/pixel_trans.gif) |
從網上訂貨大約2-3星期的時間,Appliances and Cabinets到了 (all from Costco.com, love the store).等到周末,抄起hacksaw, gorilla bar 和 hammer,開始拆! 用了大概兩個周末的時間.中間遇到了三大驚奇(難題),使我一度打算放棄自己做的想法.也找來不同的電工,水工,和contractor問價錢.Labor alone 大概要$10,000 到$12,000 的樣子.最後咬咬牙,不能花錢讓別人have fun. 自己做contractor, 把電工和vent pipes改道工程用$3000外包專業人士,接著幹,反正房子是自己的.想怎麽折騰就怎麽折騰. 照片如下:
先拆門: better have good power tools
![](http://lh4.ggpht.com/_XBN_jeLz2W4/SsxOAVieIzI/AAAAAAAAFBw/YMpWnplouaE/s800/Picture%20201.jpg)
舊sink: being hated
![](http://lh6.ggpht.com/_XBN_jeLz2W4/SsxOBHdNSfI/AAAAAAAAFB8/8fntQxpI4OQ/s800/Picture%20238.jpg)
cabinets out, strip walls to stud
![](http://lh5.ggpht.com/_XBN_jeLz2W4/SsxOC1oRooI/AAAAAAAAFCc/99iNFB5iWHc/s800/Picture%20267.jpg)
including Sofit: words of wisdom here - if you have on old one, open this first to see what\'s inside. Will have to be a factor in your design.
![](http://lh5.ggpht.com/_XBN_jeLz2W4/SsxOFgv6HnI/AAAAAAAAFC8/On1Rnx1PpBw/s800/Picture%20283.jpg)
half wall and baseboard heat: all will be gone to make way for L-island.
![](http://lh4.ggpht.com/_XBN_jeLz2W4/SsxOGL2PkOI/AAAAAAAAFDE/1qxKZLeBWcg/s800/Picture%20285.jpg)
old plumbing: galvanized pipe - typical life 50 years. better to replace with PVC.
![](http://lh4.ggpht.com/_XBN_jeLz2W4/SsxOJLrDvSI/AAAAAAAAFDw/6KWWes2BmzE/s800/Picture%20295.jpg)
Floor: to limit abesteos exposure, rip the whole plastic and plywood, strip down to wood plank subfloor. Too many screws....
![](http://lh3.ggpht.com/_XBN_jeLz2W4/SsxOR7wbo1I/AAAAAAAAFF0/zUuJ3pThaQA/s800/Picture%20377.jpg)
BIG SURPRISE #1: 4-inch cast iron main vent hiding in the sofit, would be in the way of 42-inch cabinet:
![](http://lh5.ggpht.com/_XBN_jeLz2W4/SsxOK1IdAFI/AAAAAAAAFEI/YZOFMkeIaXA/s800/Picture%20301.jpg)
BIG SURPRISE #2: 2-inch galvanized vent pipe hiding in the sofit, would be in the way of 42-inch cabinet:
![](http://lh5.ggpht.com/_XBN_jeLz2W4/SsxOKj5C6cI/AAAAAAAAFEE/OXVJs2rGjMI/s800/Picture%20300.jpg)
BIG SURPRISE #3: main electric wire panel hiding in the closet wall - to be demoed according to design:
![](http://lh6.ggpht.com/_XBN_jeLz2W4/SsxOFdKs_fI/AAAAAAAAFC4/-xRs8M4NLJo/s512/Picture%20282.jpg)
終於拆完了:
Wall A: still have to wait for electrician to move main electric lines and reroute vent line
![](http://lh5.ggpht.com/_XBN_jeLz2W4/SsxOQgzemoI/AAAAAAAAFFg/Rh2zcpCpwA4/s800/Picture%20372.jpg)
Wall B: need to reroute vent line
![](http://lh3.ggpht.com/_XBN_jeLz2W4/SsxOQ6CvauI/AAAAAAAAFFk/6kCV1nGSN_c/s800/Picture%20373.jpg)
Wall C&D: half wall is gone. need to decide on a new heating solution.
![](http://lh3.ggpht.com/_XBN_jeLz2W4/SsxORO7-3JI/AAAAAAAAFFo/kOqReefe3b0/s800/Picture%20374.jpg)
To be continued. |
![](//blog.wenxuecity.com/images/pixel_trans.gif) |
|